We're into summer update now, but I'll keep this thread rolling. Over Lode is done for weed trimming for the year. The beginner section through almost to 5 corners is completed also (thanks Rich for part of that!). I cleared two trees on Over Lode this evening, the first one ate up about an hour of my time. There is a weird dangling vine halfway down Chert Dip (don't pull on it! It's probably 60 ft up and that's a lot of weight to come down on your head), and there are also 3-4 trees down on the climb out of Chert Dip. Also please ignore/forgive my attempt at something fun to roll over on Home Stretch, I'll be taking that out eventually. In the meantime feel free to laugh at/mock my speedbump.
Serpentine Climb, Holy Schist, Home Stretch, and Pokerville need to by cleared of overgrowth. There's still 500 yds of Holy Schist reroute that needs finish work. I'm not sure how this is all going to get done with our current workforce, and personally I'm going to be riding more as soon as the trails are open.