Over Lode's Ryan Creek bridge has been pulled back up on the shore.
The Blue Mound park staff did an amazing job on Monday, December 18th. A huge thanks to Park Manager Kevin Swenson, Assistant Manager Brad Bates, Brady, and Kent.
Please note there is a loose board on the deck, and the ramps are gone (they were stuck the the frozen dirt and had to be left behind or chopped off). The bridge is taped off, please don't use it until we have a chance to make additional repairs!