Had a very productive workday. With the bridge pre built, it didn't take long to set it in place. Was able to build a little reroute into the bobsled run. Cleaned up a few places down the bobsled run. Really think a bridge down there would help a lot (something I need to discuss with the board). We then put in a switchback on the climb out of the bobsled run. Also had time to clean up the last ravine crossing before the Connector.
Had time to get a lap in after we were done.
Thanks go out to Jesse, John, Ross, Brian, Torrin, Todd and Bear.